PLM-Aging Inspection | 2/7/2017 | 2/7/2017 | 2/7/2017 | | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 2/7/2017 | 2/7/2017 | 2/7/2017 | P | PASS |
Dan Ediger
|
|
|
|
PLM-Aging Inspection | 11/8/2016 | 11/8/2016 | 11/8/2016 | | PASS |
Dan Ediger
|
|
|
Backflow certified in May
|
Sprinkler (Final) | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PART |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Pherigo >Need to recertify DCVA >ok to backfill >
|
Sprinkler (Final) | 5/2/2016 | 5/2/2016 | 5/2/2016 | P | FAIL |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Pherigo >PE pipe needs to be 160 psi upstream of backflow
|