Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberPLM16-01535
StatusFinaled
Name COOPER PLUMBING
Site Address 12160 W OVERLAND RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: Add 10 pedicure stations, 2 shampoo bowls, 2 water heaters, 1 washer box, 1 new bahtroom
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/6/20167/12/20167/12/2016ACANC
DetailsJim Little
would like call ahead; Dave Phone #: ###-####
Water and/or Sewer7/8/20167/11/20167/11/2016ACANC
DetailsJim Little
Phone #: ###-#### Inspection requested via web by Todd Walter
Final7/10/20167/11/20167/11/2016APASS
DetailsJim Little
Phone #: ###-#### Inspection requested via web by Todd Walter
Final7/5/20167/5/20167/5/2016PFAIL
DetailsJim Little
Todd Phone #: ###-####
>hair bowl drains are s-trapped
Final6/13/20166/13/20166/13/2016APART
DetailsJim Little
We have several options for the grates. Phone #: ###-#### Inspection requested via web by Todd Walter
>temp occ ok.
>need to install shampoo bowls for final.
Final6/10/20166/10/20166/10/2016PFAIL
DetailsJim Little
Phone #: ###-#### Inspection requested via web by Todd Walter
>floor sink grates will not hold a person, need a stronger grate.
Final6/8/20166/9/20166/9/2016AFAIL
DetailsJim Little
building should be open Phone #: ###-#### Inspection requested via web by Todd Walter
>Update dcva @ mop sink
>update sprinkler system backflow outside if needed.
>label backflows in mech room
>mark water downstream of rp's as non potable water per code.
>hookup remaing chairs
>need grates on floor sinks.
>glue cap drains for future wash bowls
Plumbing Rough-in5/18/20165/18/20165/18/2016PPASS
DetailsJim Little
This is for underfloor water and indirect waste piping for pedi chairs. Phone #: ###-#### Inspection requested via web by Todd Walter
>water and indirect for chairs ok.
>discused with Dave that floor sinks must remain exposed. He will tile around them.
Plumbing Rough-in5/4/20165/4/20165/4/2016APASS
DetailsJim Little
reinspect Phone #: ###-#### Inspection requested via web by Todd Walter
>gw and ri ok
Groundwork5/3/20165/3/20165/3/2016PFAIL
DetailsJim Little
This will be another partial, ground rough, and partial top out rough. Phone #: ###-#### Inspection requested via web by Todd Walter
>transition glue not approved inside building. redo all abs to pvc connections and retest.
Groundwork4/29/20164/29/20164/29/2016PPART
DetailsBill VanDegrift
Phone #: ###-#### Inspection requested via web by Todd Walter gw and ri for the pedi and hair sinks ok will call when the rest of the gw is ready talked about rp's on pedi sink water.