Final | 6/27/2017 | 6/27/2017 | 6/27/2017 | A | PASS |
Dan Ediger
|
|
|
|
PLM-Aging Inspection | 3/21/2017 | 3/21/2017 | 3/22/2017 | | PEND |
Dan Ediger
|
|
|
spoke to the contractor tagged house to call for final.
|
Water Heater Final | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | FAIL |
Dan Ediger
|
|
|
1. Remove the flex connector from the T&P valve and hard pipe. 2. Only one flex connector on each side of the water connections to the water heater. Hard pipe cold and hot water line and connect with a maximum on one 24" connector.
|
PLM-Aging Inspection | 12/6/2016 | 12/6/2016 | 12/12/2016 | | PEND |
Dan Ediger
|
|
|
Spoke with Superior office. Never heard back. Tagged door 12/12/16 to call me for inspectioin.
|