Final | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 4/19/2017 | 4/20/2017 | 4/20/2017 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER temp occ. ok.........still need to finish lobby room bar and icemaker on 2nd floor...........ds
|
Final | 4/4/2017 | 4/5/2017 | 4/5/2017 | P | NR |
Daryl Spivey
|
|
|
THIS IS THE FIRST FLOOR. MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER still a lot of equipment and counters to set for sinks to be set and drains to be ran in kitchen. Restrooms need countertops for lavs and bar area not ready to set plumbing equipment. Need to install RPBP's on washing machines instead of DCVA's..........ds
|
Final | 3/30/2017 | 3/31/2017 | 3/31/2017 | A | PART |
Eric Strole
|
|
|
THIS IS FOR FLOORS 2-5. MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-RMs 533, 433, 333 & ice machine on 4th & 2nd not complete. All other rooms on 2nd, 3rd, 4th & 5th pass.
|
Final | 3/7/2017 | 3/8/2017 | 3/8/2017 | A | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 5th and 4th floor partial..........rooms 533,433,406 and ice maker room not finished.........also need to change drains on lavs that are S trapped to meet code.........ds
|
Plumbing Rough-in | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PART |
Eric Strole
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Drains for snow melt at pool area ok to cover.
|
Plumbing Rough-in | 2/1/2017 | 2/2/2017 | 2/2/2017 | P | CANC |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER xcld by phone..............ds
|
Plumbing Rough-in | 1/3/2017 | 1/4/2017 | 1/4/2017 | A | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER as marked on plans.......ds
|
Plumbing Rough-in | 12/28/2016 | 12/29/2016 | 12/29/2016 | P | PART |
Eric Strole
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Section of dwv tested is marked on plans.
|
Plumbing Rough-in | 12/27/2016 | 12/28/2016 | 12/28/2016 | P | CANC |
Dan Ediger
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 12/21/2016 | 12/21/2016 | 12/21/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER snow melt tested 100 psi.......ds
|
Plumbing Rough-in | 12/19/2016 | 12/20/2016 | 12/20/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER as marked on plans......1st floor west side restrooms, D/F..........ds
|
Plumbing Rough-in | 12/14/2016 | 12/14/2016 | 12/14/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 1st floor restroom and g/w floor drains....ds
|
Plumbing Rough-in | 12/8/2016 | 12/9/2016 | 12/9/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER as marked on plans 1st floor partial............ds
|
Plumbing Rough-in | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 1st floor kitchen area teste as marked on plans...........ds
|
Plumbing Rough-in | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER kitchen partial.......ok to cover walls only in area marked on plans.........ds
|
Plumbing Rough-in | 11/17/2016 | 11/18/2016 | 11/18/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER rough in complete on 2, 3, 4, and 5.....ds
|
Plumbing Rough-in | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER water mains and t/sh valves rooms 301-321, 401-421, and 501-521 tested ok............ds
|
Plumbing Rough-in | 11/11/2016 | 11/14/2016 | 11/14/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER water mains on 1st floor east and 2nd floor tested ok........ds
|
Plumbing Rough-in | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER rooms 309,311,313,315, 317, 409,411,413,415,417,509,511,513,515,and 517 tub abd shower valves tested ok for cover in those rooms........ds
|
Plumbing Rough-in | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PART |
Daryl Spivey
|
|
|
Mike 2nd floor west wing r/i tested ok..2nd floor done...ds
|
Plumbing Rough-in | 10/6/2016 | 10/7/2016 | 10/7/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 2 vents in outside wall from floor sink and mop sink ok for cover.............ds
|
Plumbing Rough-in | 10/5/2016 | 10/6/2016 | 10/6/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 1st and 2nd floors partial as marked on plans..........ds
|
Plumbing Rough-in | 10/3/2016 | 10/4/2016 | 10/4/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER as marked on plans....2nd floor.........ds
|
Groundwork | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | PASS |
Daryl Spivey
|
|
|
JOB CONTACT - MIKE ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER out side shower drain........ds
|
Plumbing Rough-in | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 3rd floor tested except t/sh valves.....ds
|
Plumbing Rough-in | 9/21/2016 | 9/22/2016 | 9/22/2016 | A | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER as marked on plans.....3rd and 4th floors tested ok...........need t/sh valves........ds
|
Plumbing Rough-in | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | NR |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 9/19/2016 | 9/19/2016 | 9/19/2016 | P | PART |
Daryl Spivey
|
|
|
PRESTON IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 3rd floor east side
|
Plumbing Rough-in | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER partial on the rest of rooms on 4th floor as marked on plans.........ds
|
Plumbing Rough-in | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 4th floor tested as marked on plans..........ds
|
Plumbing Rough-in | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 4 rooms 4th floor n.e. water and waste..........ds
|
Plumbing Rough-in | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | CANC |
Daryl Spivey
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Plumbing Rough-in | 8/26/2016 | 8/29/2016 | 8/29/2016 | A | PART |
Daryl Spivey
|
|
|
PRESTON IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 4 deck drains tested ok.........ds
|
Plumbing Rough-in | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PART |
Daryl Spivey
|
|
|
PRESTON IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER deck drains tested ok west side...........ds
|
Plumbing Rough-in | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 5th floor waste and vent and partial water ok..........ds
|
Plumbing Rough-in | 8/19/2016 | 8/22/2016 | 8/22/2016 | A | PART |
Eric Strole
|
|
|
JOB CONTACT - MIKE ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-test on dwv and water in units535,537,522,524,539,541,543,542,pass.Test on dwv in unit 531 pass. Test on water in unit 533 pass.
|
Roof Drains | 8/18/2016 | 8/19/2016 | 8/19/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 6 roof drains from main roof tested ok.........ds
|
Plumbing Rough-in | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 20 rooms on S.E.tested ok except water in ceilings and chase's............ds
|
Plumbing Rough-in | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER partial on 7 rooms 5th floor east end and 7 rooms 4th floor east end. Also laundry room 5th floor. ok to rock ceiling and walls......ds
|
Plumbing Rough-in | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | PART |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER Ok to cover wall in electrical room.....ds
|