Final | 8/1/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Eric Strole
|
|
|
|
Final | 7/29/2016 | 8/1/2016 | 8/1/2016 | A | PART |
Eric Strole
|
|
|
RPBA needs tested
|
Final | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | PART |
Eric Strole
|
|
|
RPBA needs tested
|
Final | 7/28/2016 | 7/29/2016 | 7/29/2016 | A | PART |
Eric Strole
|
|
|
door open Phone #: ###-#### Inspection requested via web by john richmond-RPBA needs tested and need tempered water to wash basins
|
Plumbing Rough-in | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | PASS |
Bill VanDegrift
|
|
|
door will be open Phone #: ###-#### Inspection requested via web by john richmond ri ok
|
Plumbing Rough-in | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | FAIL |
Eric Strole
|
|
|
door should open if not code 1203 Phone #: ###-#### Inspection requested via web by john richmond-DWV test fail, missing nailplates and need approved plans on site.
|