Water and/or Sewer | 6/13/2016 | 6/13/2016 | 6/13/2016 | P | PASS |
Eric Strole
|
|
|
BACKFLOW ASSEMBLY TESTED AS LAST ITEM TO BE DONE ON WATER LINE REPLACE. ERIC ALREADY PASSED THE WATER LINE. Phone #: ###-#### Inspection requested via web by Chris Field
|
DOC - Permit Finaled | 6/13/2016 | 6/13/2016 | 6/13/2016 | P | PASS |
Eric Strole
|
|
|
|
Water and/or Sewer | 6/9/2016 | 6/10/2016 | 6/10/2016 | A | PART |
Eric Strole
|
|
|
OK to cover with clean fill. PVB needs tested.
|
Water and/or Sewer | 6/9/2016 | 6/9/2016 | 6/9/2016 | P | NR |
Eric Strole
|
|
|
Not ready
|
Water and/or Sewer | 6/9/2016 | 6/10/2016 | 6/9/2016 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
Water and/or Sewer | 5/31/2016 | 6/2/2016 | 6/2/2016 | P | NR |
Eric Strole
|
|
|
Please inspect as late as possible. Call ahead Dan (plumber) ###-#### Phone #: ###-#### Inspection requested via web by Chris Field-Not ready
|