Final | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | PASS |
Eric Strole
|
|
|
Project is ready for final inspection. Trim is complete. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 6/2/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Eric Strole
|
|
|
Hasib will be on site this am. Minor modifications to tub-shower drains for waste/vent and modified shower head heights, one new valve rough in. Remainder unchanged for remodel. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|