Final | 6/28/2016 | 6/29/2016 | 6/29/2016 | A | PASS |
Eric Strole
|
|
|
Inspection requested via web by Raul Castanon please call Jamal with Zayn Builders LLC ###-####
|
Plumbing Rough-in | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Eric Strole
|
|
|
Raul Phone #: ###-####
|
Plumbing Rough-in | 6/20/2016 | 6/20/2016 | 6/20/2016 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Plumbing Rough-in | 6/2/2016 | 6/2/2016 | 6/2/2016 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon-Kitchen sinks are required to have a 2" drain and missing nailplates.Need to summit plans for scope of work.
|