Final | 10/11/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Bill VanDegrift
|
|
|
John Phone #: ###-####
|
Final | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PART |
Eric Strole
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to install all equipment. Temp final ok.
|
Plumbing Rough-in | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Eric Strole
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 7/13/2016 | 7/14/2016 | 7/14/2016 | P | FAIL |
Jim Little
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >Need to ri water line for urinal, in wall only for future. per 403.2.1 >test mop sink and water heater rough and call for inspection.
|
Groundwork | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Jim Little
|
|
|
JOB CONTACT - MIKE ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >need approved plans onsite at ri.
|