Final | 7/18/2016 | 7/18/2016 | 7/18/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
Plumbing Rough-in | 6/9/2016 | 6/9/2016 | 6/9/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
Plumbing Rough-in | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers-Need to be 6" above flood level rim before tieing in horizontal vents.
|