Final | 10/25/2016 | 10/25/2016 | 10/25/2016 | P | PASS |
Daryl Spivey
|
|
|
|
Water and/or Sewer | 6/15/2016 | 6/15/2016 | 6/15/2016 | P | PASS |
Jim Little
|
|
|
Moved to PM today per Mandy.
|
Water and/or Sewer | 6/15/2016 | 6/16/2016 | 6/15/2016 | P | CANC |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Darren Wood
|
Water and/or Sewer | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | FAIL |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Darren Wood >water service needs to be 1 1/2" dou to length and fixture unit demand. >when water and sewer are in the same trench sewer must be pvc sch 40 entire length. >bed all sewer pipe, not just piles. >expose tie in, is has sluffed off and covered. >cleanout from house exceeds 100'
|
Water and/or Sewer | 6/12/2016 | 6/13/2016 | 6/13/2016 | P | NR |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Darren Wood >not ready for the second time, still digging,
|
Water and/or Sewer | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | NR |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Darren Wood
|