PLM-Aging Inspection | 4/12/2017 | 4/12/2017 | 4/13/2017 | | PASS |
Dan Ediger
|
|
|
Inspection complete
|
Final | 4/13/2017 | 4/13/2017 | 4/13/2017 | A | PASS |
Dan Ediger
|
|
|
|
Final | 4/12/2017 | 4/13/2017 | 4/13/2017 | A | CANC |
Dan Ediger
|
|
|
|
PLM-Aging Inspection | 1/11/2017 | 1/11/2017 | 1/12/2017 | | PEND |
Dan Ediger
|
|
|
Inspect after snow melt. Pool closed.
|
Final | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PEND |
Jim Little
|
|
|
would like call ahead Phone #: ###-#### >20lb gas test ok but I will not pass until a mechanical inspection has been done on pool heater.
|
Other | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | FAIL |
Jim Little
|
|
|
Jim-Gas Pressure Phone #: ###-#### >pressure test fail, needs to be 20lbs on a 30lb gauge for low pressure. >3/4 flex connector will not feed 400,000 btu's >stop work order put on job until proper permits are pulled for building, plumbing (water)and mechanical for pool heater.
|