Final | 1/4/2017 | 1/5/2017 | 1/5/2017 | P | PASS |
Daryl Spivey
|
|
|
Peter is homeowner and will be home for access for final plumbing inspection of basement bathroom remodel. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Final | 12/22/2016 | 12/23/2016 | 12/23/2016 | A | NH |
Eric Strole
|
|
|
Basement bathroom is ready for final inspection. All is complete. Please call Peter the owner at ###-#### to confirm access to home. Thanks. Phone #: ###-#### Inspection requested via web by Scott Sparrell-Called no answer,left message
|
Plumbing Rough-in | 7/13/2016 | 7/13/2016 | 7/13/2016 | A | PEND |
Daryl Spivey
|
|
|
Top out of bathroom and aw box in basement plumbed and under test. Sean is your contact if questions. ###-####. Customer is home for access. Basement work. Phone #: ###-#### Inspection requested via web by Scott Sparrell bld permit required before plg can pass.........created MIS..........ds
|
Groundwork | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Daryl Spivey
|
|
|
Backwater valve is in and ready for re-inspection. Sean is contact ###-#### Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Groundwork | 6/30/2016 | 6/30/2016 | 6/30/2016 | A | FAIL |
Eric Strole
|
|
|
Groundwork for basement bathroom. Sean is contact ####-#### Phone #: ###-#### Inspection requested via web by Scott Sparrell-Need to install a backwater valve.
|