Final | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
Jim Little
|
|
|
ok
|
Final | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | PART |
Jim Little
|
|
|
Dave Phone #: ###-#### >new 3" HDPE ok to building >need to see final fusion at building
|
DOC - Permit Finaled | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Jim Little
|
|
|
|
Water and/or Sewer | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Jim Little
|
|
|
>Received stamped letter from engineer stating 2" is ok for fixture unit load. >ok to cover
|
Plumbing Rough-in | 7/13/2016 | 7/14/2016 | 7/14/2016 | A | PEND |
Jim Little
|
|
|
Water line - Troy Phone #: ###-#### >need letter from engineer approving downsize to 2" water service from 3"
|
Water and/or Sewer | 7/11/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Jim Little
|
|
|
Troy-water line only Phone #: ###-#### >new ws ok
|