Final | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Jim Little
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >all corrections made
|
Plumbing Rough-in | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | CANC |
Jim Little
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | FAIL |
Jim Little
|
|
|
*Starbucks inside Fred Meyer* This inspection was done on 6/28/16 under permit plm16-02080 before this new permit was pulled. >support vertical copper drops every 10' and provide a mid story guide for pvc drop per table 3-2 >add hanger on 3" pvc horizontal vent before drop. >add hanger on 3/4" copper water lines at tie in point so its supported every 6' per table 3-2 >run condensate drain from condenser seperate from ice bin drain to avoid contaminating the ice. >need airgap on r/o drain and softener drain. >need to verify airgap on ice maker and missing coffee equipment.
|