Final | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by jeff flatt
|
Plumbing Rough-in | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | PASS |
Eric Strole
|
|
|
we should be ready by 1:00. Phone #: ###-#### Inspection requested via web by jeff flatt
|
Water and/or Sewer | 7/26/2016 | 7/29/2016 | 7/29/2016 | P | CANC |
Eric Strole
|
|
|
Late Afternoon. Thanks, Jen Phone #: ###-#### Inspection requested via web by Jennifer Fitzpatrick
|
Plumbing Rough-in | 7/26/2016 | 7/26/2016 | 7/26/2016 | P | DONE |
Eric Strole
|
|
|
1:00 PM-Conferance on water
|
Plumbing Rough-in | 7/26/2016 | 7/26/2016 | 7/26/2016 | A | CANC |
Eric Strole
|
|
|
would like to meet at 11:00 if possible. Phone #: ###-#### Inspection requested via web by jeff flatt-Changed to 1:00 PM
|