Final | 6/5/2017 | 6/5/2017 | 6/5/2017 | P | PASS |
Dan Ediger
|
|
|
Key is under clean out cover Phone #: ###-#### Inspection requested via web by Cameron Neddo
|
Final | 5/30/2017 | 5/30/2017 | 5/30/2017 | A | FAIL |
Dan Ediger
|
|
|
This inspection is for the connection of the sewer and water line for the bathroom pod. Phone #: ###-#### Inspection requested via web by Cameron Neddo. 1. Install a trap primer to the mechanical room floor drain. 2. Install a clean-out fitting at the sewer clean-out. 3. Support all horizontal drain lines. 4. Tighten all clean-out plugs.
|
PLM-Aging Inspection | 3/1/2017 | 3/1/2017 | 3/2/2017 | | PEND |
Dan Ediger
|
|
|
wip
|
Groundwork | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Cameron Neddo >gw inside the bld ok >water and sewer outside waiting on engineer.
|
Groundwork | 8/2/2016 | 8/2/2016 | 8/2/2016 | A | FAIL |
Jim Little
|
|
|
Ground work for pre made bathroom pod Phone #: ###-#### Inspection requested via web by Cameron Neddo >need approved plans onsite >need copper exposed, type of copper and copper is deformed. >water needs test >need adequate water and sewer hookup.
|