Final | 9/22/2016 | 9/22/2016 | 9/22/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
Final | 9/20/2016 | 9/21/2016 | 9/21/2016 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
Final | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers-Need to install 2 toilets and a wash basin for a final.
|
Plumbing Rough-in | 8/9/2016 | 8/10/2016 | 8/10/2016 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|