Final | 11/8/2016 | 11/9/2016 | 11/9/2016 | A | PASS |
Eric Strole
|
|
|
Tobey Phone #: ###-####
|
Final | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | PART |
Eric Strole
|
|
|
8:oo AM-Conferance on backflows required. Temp final ok.
|
Other | 11/4/2016 | 11/4/2016 | 11/4/2016 | A | PASS |
Eric Strole
|
|
|
Gas final pass.
|
Water and/or Sewer | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | CANC |
Eric Strole
|
|
|
GAS PIPE FINAL Phone #: ###-#### Inspection requested via web by TOBI WLSON
|
Final | 11/2/2016 | 11/3/2016 | 11/3/2016 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by TOBI WLSON
|
Plumbing Rough-in | 10/6/2016 | 10/7/2016 | 10/6/2016 | A | PASS |
Bill VanDegrift
|
|
|
1. Proper insulation behind water lines in the outside wall. 2. extend the roof drain cleanout to be accessable. 3. Add grade to the outside frost proof hydrant.
|
Other | 10/5/2016 | 10/6/2016 | 10/6/2016 | A | PASS |
Bill VanDegrift
|
|
|
GAS PRESSURE TEST. PER Bill Vandegrift Inspection requested via web by TOBI WLSON 60 lb gas test ok
|
Plumbing Rough-in | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by TOBI WLSON ri ok
|
Plumbing Rough-in | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | CANC |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by TOBI WLSON need to submit plans for the modification
|
Groundwork | 8/23/2016 | 8/25/2016 | 8/25/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Tobi Wilson
|
Water and/or Sewer | 8/10/2016 | 8/11/2016 | 8/12/2016 | P | PART |
Eric Strole
|
|
|
WATER LINE Phone #: ###-#### Inspection requested via web by Tobi Wilson-Waterline pass
|