Final | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Dan Ediger
|
|
|
Other contractors should be on site. If not please give me a call. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|
Plumbing Rough-in | 8/19/2016 | 8/19/2016 | 8/19/2016 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Johnson ri ok with softener drain to washer box.
|
Plumbing Rough-in | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | FAIL |
Jim Little
|
|
|
Should be ready to go. Please call with any issues. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson >leaks in crawl on dwv >hang every 4' in crawl >backgraded vent by furnace drain in attic >tent water line in attic at shower
|