Final | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Eric Strole
|
|
|
Tower 2 Phone #: ###-#### Inspection requested via web by wes Ritchie
|
Final | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | NR |
Eric Strole
|
|
|
Tower two 509-519 -409-419 -309-319 -209-219 Phone #: ###-#### Inspection requested via web by wes Ritchie-Not ready
|
Final | 4/5/2018 | 4/5/2018 | 4/5/2018 | A | PART |
Daryl Spivey
|
|
|
8-units on third floor 8-units on the second floor Phone #: ###-#### Inspection requested via web by wes Ritchie 201 thru 208 and 301 thru 308 completed...........ds
|
Final | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PART |
Eric Strole
|
|
|
8 units on fifth floor 8- units on fourth floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Rooms 401 thru 408 & 501 thru 508 pass.
|
Other | 3/5/2018 | 3/5/2018 | 3/5/2018 | P | PASS |
Ben Livingston
|
|
|
4gas lines Phone #: ###-#### Inspection requested via web by wes Ritchie 60lb x4
|
Other | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | PART |
Eric Strole
|
|
|
6 gas lines Phone #: ###-#### Inspection requested via web by wes Ritchie-2-60 lb gas test passed are tagged.
|
Other | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PART |
Eric Strole
|
|
|
18 gas lines Phone #: ###-#### Inspection requested via web by wes Ritchie-12-60 lb gas tests that passed are tagged.
|
Other | 2/22/2018 | 2/22/2018 | 2/22/2018 | P | PART |
Eric Strole
|
|
|
18 gas lines. Water main on 2nd floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water mains pass.
|
Other | 2/5/2018 | 2/6/2018 | 2/6/2018 | A | PART |
Eric Strole
|
|
|
Water heater vents on 2nd floor 209-220 Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on w/h flues in units 209 thru 220 pass
|
Other | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PART |
Eric Strole
|
|
|
27 gas lines Phone #: ###-#### Inspection requested via web by wes Ritchie-The 27 60 lb gas test pass and are tagged.
|
Other | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PART |
Eric Strole
|
|
|
Water heater vents on third floor 309-320 Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on w/h flues in units 309 thru 320 pass.
|
Other | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | PASS |
Ben Livingston
|
|
|
Water heater vents 409 through 4:20 Phone #: ###-#### Inspection requested via web by wes Ritchie 409-420 5lb flue
|
Other | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PART |
Eric Strole
|
|
|
Water heater vents 5th floor. 508-520 Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water heater flues in units 508 thru 520 pass.
|
Other | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PART |
Bill VanDegrift
|
|
|
Water heater vents 201 threw 208 Phone #: ###-#### Inspection requested via web by wes Ritchie pt ok 201 through 208
|
Other | 10/23/2017 | 10/24/2017 | 10/24/2017 | P | PART |
Eric Strole
|
|
|
Gas lines 16 Phone #: ###-#### Inspection requested via web by wes Ritchie-Partial 60 lb gas test in units 210,213,309,310,313,409,509,510 & 513 pass.
|
Other | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PART |
Eric Strole
|
|
|
Gas lines 28 Phone #: ###-#### Inspection requested via web by wes Ritchie-Partial 60 lb gas test in units 209 thru 219. 318,418 & 518 pass.
|
Other | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PART |
Eric Strole
|
|
|
Third floor water heater vents 301 to 308 Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water heater flues in units 301 thru 308 pass
|
Other | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | PART |
Eric Strole
|
|
|
Water heater vents 8 units on fourth floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water heater flues in units 401 thru 408 pass.
|
Other | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | PART |
Eric Strole
|
|
|
Water heater vents 502 Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on w/h flue in unit 502 pass
|
Other | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | NR |
Eric Strole
|
|
|
One water heater vent on fifth floor. 502 Phone #: ###-#### Inspection requested via web by wes Ritchie-Not ready
|
Other | 9/29/2017 | 9/29/2017 | 9/29/2017 | P | PART |
Eric Strole
|
|
|
Water heater vents fifth floor 501,502,503,504,505,506,507,508 Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on w/h flues in units 501,503,504,505,506,507,& 508 pass.
|
Plumbing Rough-in | 9/27/2017 | 9/27/2017 | 9/27/2017 | P | PASS |
Eric Strole
|
|
|
Rough in on south tower Second half of gas piping north tower 16 units Phone #: ###-#### Inspection requested via web by wes Ritchie-DWV & water 3rd, 4th & 5th flr pass.
|
Other | 9/21/2017 | 9/21/2017 | 9/21/2017 | A | PART |
Eric Strole
|
|
|
16 gas lines Phone #: ###-#### Inspection requested via web by wes Ritchie-16- 60 lb gas test pass.
|
Plumbing Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | PASS |
Eric Strole
|
|
|
Waters on second floor stub outs for main Roof drains Overflow drains 2- 4" vents from garage to roof Phone #: ###-#### Inspection requested via web by wes Ritchie-Water stub outs, roof drains and over flows and garage vents pass.
|
Plumbing Rough-in | 9/11/2017 | 9/11/2017 | 9/11/2017 | A | PART |
Eric Strole
|
|
|
Garage and second floor dwv Phone #: ###-#### Inspection requested via web by wes Ritchie-Garage and 2nd flr dwv north tower pass.
|
Plumbing Rough-in | 9/8/2017 | 9/8/2017 | 9/8/2017 | P | CANC |
Eric Strole
|
|
|
Dwv garage and seconded floor Phone #: ###-#### >> Inspection requested via web by wes Ritchie Inspection cancelled from web by: wes Ritchie
|
Other | 8/28/2017 | 8/29/2017 | 8/29/2017 | A | PART |
Eric Strole
|
|
|
Gas test-60 lb gas test on section of piping in units 301 thru 308 pass.
|
Other | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PART |
Eric Strole
|
|
|
The two gas lines that failed last week Phone #: ###-#### Inspection requested via web by wes Ritchie-60 lb gas test on section of gas piping in units 406 & 508 pass.
|
Other | 8/22/2017 | 8/23/2017 | 8/23/2017 | P | PART |
Eric Strole
|
|
|
Gas pipe on 4th floor Phone #: ###-#### Inspection requested via web by wes Ritchie-60 lb gas test on section in units 401 thru 407 pass. 501 thru 505 pass.
|
Plumbing Rough-in | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | PART |
Eric Strole
|
|
|
Water lines second floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water in units 209 thru 219 pass.
|
Other | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | PART |
Eric Strole
|
|
|
8 gas lines Phone #: ###-#### Inspection requested via web by wes Ritchie-Partial 60 lb gas test on sections of pipe in units 501, 502, 503, 505, 506, 507 & 508 pass.
|
Plumbing Rough-in | 7/27/2017 | 7/27/2017 | 7/27/2017 | P | PART |
Eric Strole
|
|
|
Water line 5th floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water 5th flr south tower pass
|
Plumbing Rough-in | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | PART |
Eric Strole
|
|
|
Waters on the 4th floor Phone #: ###-#### Inspection requested via web by wes Ritchie-test on water 4th flr south tower pass.
|
Plumbing Rough-in | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie-3rd, 4th & 5th flr south tower dwv pass.
|
Water and/or Sewer | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | PART |
Eric Strole
|
|
|
Roof and overflow drains Phone #: ###-#### Inspection requested via web by wes Ritchie-Roof drains & interceptor vent & 1st flr vents for drains into interceptor pass south tower pass.
|
Roof Drains | 7/18/2017 | 7/18/2017 | 7/18/2017 | P | CANC |
Eric Strole
|
|
|
Roof and overflow drains Phone #: ###-#### Inspection requested via web by wes Ritchie
|
Plumbing Rough-in | 7/13/2017 | 7/17/2017 | 7/17/2017 | A | PART |
Eric Strole
|
|
|
DWV south tower 1st & 2nd flr pass.
|
Plumbing Rough-in | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PART |
Eric Strole
|
|
|
Garage drains and second floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Missing nailplates, Vent needs to be downstream of p-trap & cannt roll Y on horizontal wet vent.
|
Plumbing Rough-in | 7/12/2017 | 7/12/2017 | 7/12/2017 | P | PART |
Eric Strole
|
|
|
Dwv on two and three Inspection requested via web by wes Ritchie-Water test 3rd flr south tower pass.
|
Plumbing Rough-in | 7/11/2017 | 7/12/2017 | 7/12/2017 | A | PART |
Eric Strole
|
|
|
Water lines on second floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water 2nd flr south tower pass.
|
PLM-Aging Inspection | 5/18/2017 | 5/18/2017 | 5/18/2017 | | PART |
Eric Strole
|
|
|
wip
|
Other | 2/16/2017 | 2/16/2017 | 2/16/2017 | P | DONE |
Eric Strole
|
|
|
Walk-thru
|
Plumbing Rough-in | 2/14/2017 | 2/15/2017 | 2/15/2017 | A | DONE |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie-Walk-thru on 3rd flr
|
Plumbing Rough-in | 2/14/2017 | 2/15/2017 | 2/15/2017 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie
|
Plumbing Rough-in | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie
|
Plumbing Rough-in | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie-Walk thru
|