Final | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | PASS |
Dan Ediger
|
|
|
RP certificatioin
|
Final | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | CANC |
Dan Ediger
|
|
|
Late morning if possible Phone #: ###-#### Inspection requested via web by Todd Walter
|
Final | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PART |
Dan Ediger
|
|
|
Contact for lock box and alarm code. Phone #: ###-#### Inspection requested via web by Todd Walter. Need to install backflow prevention at the plaster grinder.
|
Plumbing Rough-in | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | PASS |
Bill VanDegrift
|
|
|
call if building is locked Phone #: ###-#### Inspection requested via web by Todd Walter
|