Final | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | PASS |
Dan Ediger
|
|
|
RP certification required
|
Final | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PART |
Dan Ediger
|
|
|
If questions, please call Josh at ####-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Final | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | PART |
Dan Ediger
|
|
|
If questions, please call Josh at ####-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. RP needs certified
|
Plumbing Rough-in | 9/26/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Bill VanDegrift
|
|
|
Josh// after hours inspection Phone #: ###-#### ri ok
|
Plumbing Rough-in | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | PART |
Bill VanDegrift
|
|
|
if questions call Josh @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann partial ri ok vent system pipied to column C 3.8 and need to be upsized to 3" for exceeding max. horizontal length.
|