Final | 12/5/2016 | 12/6/2016 | 12/6/2016 | A | PASS |
Dan Ediger
|
|
|
Ron Phone #: ###-####
|
Final | 11/30/2016 | 11/30/2016 | 11/30/2016 | P | PART |
Dan Ediger
|
|
|
ron Phone #: ###-####. 1. Certify all backflow assemblies. 2. Grade all air-gap drain lines. 3. Cap all unused valves. 4. Eliminate pipe size reduction on the island water line feeds. 5. Strap 1/2" water line behind the soda machine. 6. All equipment must be installed prior to final.
|
Final | 11/28/2016 | 11/29/2016 | 11/29/2016 | P | NR |
Dan Ediger
|
|
|
|
Final | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | NR |
Dan Ediger
|
|
|
Ron Phone #: ###-####3
|
Plumbing Rough-in | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Bill VanDegrift
|
|
|
Doug Phone #: ###-#### finish nail plates and will change premis rp to a dcva by final
|
Plumbing Rough-in | 9/30/2016 | 10/3/2016 | 10/3/2016 | A | PART |
Bill VanDegrift
|
|
|
Doug Phone #: ###-#### interceptor venting ok to cover
|
Groundwork | 8/26/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Bill VanDegrift
|
|
|
Ron Phone #: ###-#### gw ok with c.o.'s on wc vents
|