Final | 10/21/2016 | 10/21/2016 | 10/21/2016 | A | PASS |
Eric Strole
|
|
|
|
Other | 10/20/2016 | 10/21/2016 | 10/21/2016 | A | PASS |
Eric Strole
|
|
|
interceptor test-Test on interceptor pass.
|
Water and/or Sewer | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PART |
Bill VanDegrift
|
|
|
start interceptor test
|
Water and/or Sewer | 10/20/2016 | 10/20/2016 | 10/20/2016 | A | PART |
Eric Strole
|
|
|
Bill Vandegrift Inspected piping and gave ok to cover. Still need 24 hr test on interceptor and need to verify baffels have been installed.
|
Water and/or Sewer | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | FAIL |
Bill VanDegrift
|
|
|
Joe Phone #: ###-#### 1. 4" sewer backgrading from the building to the interceptor. 2. Interceptor vent needs to be a wye branch ftg. made of like materials with the pipe or use shielded bands. 3. C.O. outside of tank is installed backwards. Relocate just outside of the tank. Extend to grade in sch. 40.
|