Water and/or Sewer | 11/25/2016 | 11/25/2016 | 11/25/2016 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Aarin Van Curen. Final
|
Final | 11/25/2016 | 11/25/2016 | 11/25/2016 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Aarin Van Curen
|
Final | 11/22/2016 | 11/22/2016 | 11/22/2016 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Aarin Van Curen. No permit on the sprinkler backflow.
|
Final | 11/20/2016 | 11/21/2016 | 11/21/2016 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Aarin Van Curen. Sprinkler permit not pulled on the irrigation double check valve. The assembly needs certified.
|
Plumbing Rough-in | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Aarin Van Curen
|