Final | 12/27/2016 | 12/27/2016 | 12/27/2016 | P | PASS |
Eric Strole
|
|
|
Builder will be there. Andrew With Base Construction Phone #: ###-#### Inspection requested via web by Steve Spence
|
Final | 12/23/2016 | 12/23/2016 | 12/23/2016 | P | NH |
Eric Strole
|
|
|
Home will be open Phone #: ###-#### Inspection requested via web by Steve Spence-eed someone there for access
|
Plumbing Rough-in | 9/21/2016 | 9/22/2016 | 9/22/2016 | A | PASS |
Eric Strole
|
|
|
Lock box on the front door is 4480 Phone #: ###-#### Inspection requested via web by Steve Spence-Need to add all new fixtures to permit by final.
|