Final | 2/23/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Eric Strole
|
|
|
|
Roof Drains | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Eric Strole
|
|
|
|
Roof Drains | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | FAIL |
Eric Strole
|
|
|
Zach Phone #: ###-#### Need to use dwv fittings
|
Water and/or Sewer | 10/13/2016 | 10/14/2016 | 10/14/2016 | A | PART |
Eric Strole
|
|
|
test on sewer pass
|
Water and/or Sewer | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PART |
Eric Strole
|
|
|
ok to cover sewer requires test
|
Water and/or Sewer | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PART |
Eric Strole
|
|
|
Section complete ok to cover.
|
Water and/or Sewer | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | PART |
Eric Strole
|
|
|
sewer only\\Zac Phone #: ###-####-1st 60' of sewer from sewer stub to building ok to cover, still need test.
|