Final | 2/7/2017 | 2/8/2017 | 2/8/2017 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Final | 2/3/2017 | 2/6/2017 | 2/6/2017 | P | NR |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Final | 2/3/2017 | 2/3/2017 | 2/3/2017 | P | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige.] Label all piping per ISPC 601.2. Install rp backflow preventors on autoclav.
|
Plumbing Rough-in | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Water and/or Sewer | 11/16/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Plumbing Rough-in | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. North end of the building. 75% (north) ok and second floor drains under floor ok.
|
Plumbing Rough-in | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. North end. 75% of the building and second floor piping in the ceiling ok.
|
Plumbing Rough-in | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|
Groundwork | 10/13/2016 | 10/14/2016 | 10/13/2016 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige majority of the ground work ok, deleted a floor sink in the lab, need to finish around the elevator and the trench drain and trap in the trash area.
|