Final | 10/28/2016 | 10/31/2016 | 10/31/2016 | A | PASS |
Daryl Spivey
|
|
|
Please go after 9am and call Suzanne before arriving, thank you. Phone #: ###-#### Inspection requested via web by TERESA HUTTO
|
Final | 10/18/2016 | 10/25/2016 | 10/25/2016 | A | FAIL |
Daryl Spivey
|
|
|
There is a mechanical final inspection at the same time of this inspection. Please call Suzanne at ###-#### before arriving, thank you. Phone #: ###-#### Inspection requested via web by TERESA HUTTO need to drill hole in trapped portion of piping for T&P..........ds
|