Final | 12/20/2016 | 12/21/2016 | 12/21/2016 | P | PASS |
Dan Ediger
|
|
|
final (forgot to input phone number) Phone #: ###-#### Inspection requested via web by Lynn Laurel
|
Final | 12/20/2016 | 12/21/2016 | 12/20/2016 | P | CANC |
Dan Ediger
|
|
|
Final >> Inspection requested via web by Lynn Laurel Inspection cancelled from web by: Lynn Laurel
|
Water and/or Sewer | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | PASS |
Dan Ediger
|
|
|
re-inspect rough in Phone #: ###-#### Inspection requested via web by Lynn Laurel
|
Water and/or Sewer | 11/4/2016 | 11/7/2016 | 11/7/2016 | A | FAIL |
Dan Ediger
|
|
|
ready for rough in plumbing inspection Phone #: ###-#### Inspection requested via web by Lynn Laurel. 1. pressure test the drainage and vent system. 5#. 2. Install 1-1/2"x5" nail plates. 3. Improper wet vent: Use a 3"x2" santee above the toilet 3" santee. 4. add clean-outs on the 3" drain and the 1-1/2" bar sink drain. Call Dan with any questions: ###-####.
|