Final | 1/12/2017 | 1/12/2017 | 1/12/2017 | A | PASS |
Daryl Spivey
|
|
|
Tile contractor will be on site. He has toilet pulled. Rest is ready for final. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Daryl Spivey
|
|
|
rough in for detached garage toilet, AW, lavatory and bar sink. Drain, vent and waters ready. Hasib is on site. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Water and/or Sewer | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | CANC |
Daryl Spivey
|
|
|
Scott-Sewer line only Phone #: ###-#### Inspection cancelled from web by: Scott Sparrell
|
Water and/or Sewer | 10/18/2016 | 10/18/2016 | 10/18/2016 | P | NR |
Daryl Spivey
|
|
|
Partial
|