PLM-Aging Inspection | 6/15/2017 | 6/15/2017 | 6/15/2017 | | PASS |
Dan Ediger
|
|
|
|
Final | 6/15/2017 | 6/15/2017 | 6/15/2017 | A | PASS |
Dan Ediger
|
|
|
|
Other | 3/16/2017 | 3/17/2017 | 3/17/2017 | P | PASS |
Bill VanDegrift
|
|
|
Complete 24 hour test on the grease intercepter it's tight
|
Other | 3/16/2017 | 3/16/2017 | 3/16/2017 | P | PART |
Dan Ediger
|
|
|
Start 24 hour test on the grease interceptor
|
Groundwork | 3/10/2017 | 3/10/2017 | 3/10/2017 | P | PART |
Dan Ediger
|
|
|
Matt Phone #: ###-####. Water service ok to cover
|
Water and/or Sewer | 10/28/2016 | 10/28/2016 | 10/28/2016 | A | PART |
Bill VanDegrift
|
|
|
sewer main line test ok no interceptor yet, will need to trun tank 90 degrees and have a side inlet to fit on site.
|
Water and/or Sewer | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | PART |
Eric Strole
|
|
|
Check on progress-300 feet installed.
|
Water and/or Sewer | 10/24/2016 | 10/25/2016 | 10/25/2016 | P | CANC |
Eric Strole
|
|
|
Check progress
|
Water and/or Sewer | 10/20/2016 | 10/24/2016 | 10/24/2016 | A | PART |
Eric Strole
|
|
|
check progress- 180' installed.
|
Water and/or Sewer | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PART |
Bill VanDegrift
|
|
|
check on sewer another 20" then held up for foundation work, approved foundation plans in the job shack
|
Other | 10/19/2016 | 10/19/2016 | 10/19/2016 | P | PART |
Bill VanDegrift
|
|
|
1st 120 feet of 6" sewer ok. no access to the approved plans today check in the morning.
|