Final | 11/2/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Bill VanDegrift
|
|
|
Please call Kyle @ ###-#### to find out when he''ll be there. Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg
|
Final | 10/27/2016 | 11/1/2016 | 11/1/2016 | P | FAIL |
Dan Ediger
|
|
|
Please call Michele @ ###-#### so that she can leave work and meet you there. Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg. Installed sch40 pvc for the t&p drain line. Need the used approved piping material for hot water and inside the house. Need to extend the drain pan drain off of the platform to the floor of the garage.
|
Final | 10/19/2016 | 10/20/2016 | 10/20/2016 | P | NR |
Eric Strole
|
|
|
PM install - Please call Kyle @ ###-#### to make sure he''s ready. Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg-Have not installed water heater yet.
|