PLM-Aging Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 | | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Dan Ediger
|
|
|
No action on scheduling. Stacey from Suez has been notified
|
PLM-Aging Inspection | 2/19/2018 | 2/19/2018 | 2/20/2018 | | PEND |
Dan Ediger
|
|
|
|
PLM-Aging Inspection | 11/20/2017 | 11/20/2017 | 11/20/2017 | | PEND |
Dan Ediger
|
|
|
Notified Stacey from Suez.
|
PLM-Aging Inspection | 8/21/2017 | 8/21/2017 | 8/21/2017 | | PEND |
Dan Ediger
|
|
|
Talked to tenant will talk to owner.
|
PLM-Aging Inspection | 5/22/2017 | 5/22/2017 | 5/22/2017 | | PEND |
Dan Ediger
|
|
|
Tagged the door. PVB test failed
|
Water and/or Sewer | 10/28/2016 | 10/28/2016 | 10/28/2016 | A | PART |
Bill VanDegrift
|
|
|
ok to cover the connections with the last foot of utility piping changed to 160 psi min. will recall when the pvb is tested.
|
Water and/or Sewer | 10/26/2016 | 10/27/2016 | 10/27/2016 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Adams use approved piping to srinkler tie in and test pvb
|