Final | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | PASS |
Dan Ediger
|
|
|
|
Final | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PART |
Dan Ediger
|
|
|
Will be open at 8am Phone #: ###-#### Inspection requested via web by Rod Davey. Add tempering valve or valves for the public sinks.
|
PLM-Aging Inspection | 5/29/2017 | 5/29/2017 | 5/30/2017 | | PEND |
Dan Ediger
|
|
|
wip
|
Plumbing Rough-in | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Rod Davey
|
Plumbing Rough-in | 1/31/2017 | 2/1/2017 | 2/1/2017 | P | PART |
Dan Ediger
|
|
|
partial roughin so they can insulate some walls and turn heat on Phone #: ###-#### Inspection requested via web by Rod Davey. OK to cover all but the mechanical room.
|
Storm Drains | 12/7/2016 | 12/7/2016 | 12/7/2016 | P | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Rod Davey. waste and vent to the grease interceptor. Notified the contractors supervisor that the interceptor will need to be exposed prior to the 24 hour test. He acknowleged.
|
Groundwork | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Rod Davey
|