Final | 6/2/2017 | 6/5/2017 | 6/5/2017 | A | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen
|
Final | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PART |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen. Upstairs floor drains need to be increased to accept two 3/4" drains.
|
Plumbing Rough-in | 3/9/2017 | 3/13/2017 | 3/13/2017 | A | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 3/9/2017 | 3/10/2017 | 3/9/2017 | P | CANC |
Dan Ediger
|
|
|
>> Inspection requested via web by Brian Johansen Inspection cancelled from web by: Brian Johansen
|
Groundwork | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen
|