Final | 1/20/2017 | 1/20/2017 | 1/20/2017 | P | PASS |
Eric Strole
|
|
|
|
Final | 1/4/2017 | 1/9/2017 | 1/9/2017 | A | FAIL |
Eric Strole
|
|
|
Please contact Kacy 30-45 minutes prior to arrival for final inspection. Phone #: ###-#### Inspection requested via web by Kassy Goodwin-Need to hook-up all equipment. Need to move RPBA for soda & DBCA for ice to an accessible location. Need to check coffee maker to see if a backflow is required.
|
Groundwork | 12/2/2016 | 12/5/2016 | 12/5/2016 | A | PASS |
Eric Strole
|
|
|
Jeff Burch 45 mins prior to arriva ###-#### Phone #: ###-#### Inspection requested via web by Kassy Goodwin
|
Plumbing Rough-in | 12/1/2016 | 12/1/2016 | 12/1/2016 | P | DONE |
Eric Strole
|
|
|
Please call Jeff Burch 45 mins-1 hr prior to arrival . Questions on the code for the job we''re performing. Phone #: ###-#### Inspection requested via web by Kassy Goodwin-Conferance
|