Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberPLM16-04388
StatusFinaled
Name BOISE PLUMBING AND DRAIN
Site Address 2940 S FIVE MILE RD
Project NameFive Mile Farms & Greenhouse
Customer Number 
ePlanReviewNo
Description
running water line from meter to existing green house and stubbing out-running gas line from existing line to new green house location and stubbing out // added $350 in value for backflow preventer 3/6/17
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/6/20173/7/20173/7/2017ACANC
DetailsDan Ediger
Keith Phone #: ###-####
Final3/6/20173/6/20173/6/2017APASS
DetailsDan Ediger
Sprinkler (Final)2/28/20172/28/20172/28/2017PPART
DetailsDan Ediger
New PVB ok. Need to add a Reduced Pressure Backflow Assembly in the new water line due to a new chemical injection system.
Other12/1/201612/2/201612/2/2016APART
DetailsDan Ediger
Matt-gas pressure Phone #: ###-####
Water and/or Sewer12/1/201612/2/201612/2/2016APART
DetailsDan Ediger
Matt Phone #: ###-####.
1. Use 30psi guage for 20psi test on the gas line.
2. Plastic gas line bury 18" min.
3. Install a 14 ga. coated tracer wire on the plastic gas line.
4. Protect steal gas line with 20 mil tape to 6" above grade.
5. Certify PVB.
6. OK to cover water line.