Final | 7/26/2017 | 7/27/2017 | 7/27/2017 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Vitek
|
Final | 7/20/2017 | 7/21/2017 | 7/21/2017 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Vitek-DBCA needs tested.
|
PLM-Aging Inspection | 7/19/2017 | 7/19/2017 | 7/19/2017 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 2/12/2017 | 2/13/2017 | 2/13/2017 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Vitek
|
Plumbing Rough-in | 2/6/2017 | 2/7/2017 | 2/7/2017 | P | PART |
Eric Strole
|
|
|
first building on the right. Phone #: ###-#### Inspection requested via web by Todd Vitek-Need to be 6" above flood level rim before tieing vent together. Need to fix backgrade.
|
Other | 12/20/2016 | 12/22/2016 | 12/22/2016 | A | DONE |
Eric Strole
|
|
|
Thursday 8:30 prejob meeting. Thanks Eric Phone #: ###-#### Inspection requested via web by Todd Vitek-This was a construction meeting.
|