Final | 7/10/2017 | 7/10/2017 | 7/10/2017 | P | PASS |
Eric Strole
|
|
|
|
Water and/or Sewer | 3/9/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Eric Strole
|
|
|
Randy Phone #: ###-####-Test on waterline pass, ok to cover.
|
Water and/or Sewer | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | FAIL |
Eric Strole
|
|
|
Water only //randy Phone #: ###-####-Need to test waterline.
|
Water and/or Sewer | 3/7/2017 | 3/7/2017 | 3/7/2017 | A | NR |
Eric Strole
|
|
|
Need to test waterline.
|
Water and/or Sewer | 3/2/2017 | 3/3/2017 | 3/3/2017 | A | PART |
Eric Strole
|
|
|
Test on interceptor vent pass. Water service is undersized per the approved plans. Needs to be an 1 1/2 " waterline.
|
Water and/or Sewer | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | PART |
Eric Strole
|
|
|
Test on interceptor pass.
|
Water and/or Sewer | 2/27/2017 | 2/27/2017 | 2/27/2017 | A | PART |
Eric Strole
|
|
|
Start of 24 hr test on interceptor.
|
Water and/or Sewer | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | PART |
Eric Strole
|
|
|
Test on up-stream and down-stream piping of interceptor except vent pass. Still need to run vent.
|
Water and/or Sewer | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | DONE |
Eric Strole
|
|
|
Conferance
|
Plumbing Rough-in | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | CANC |
Eric Strole
|
|
|
Trevor Phone #: ###-####
|
Other | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | DONE |
Eric Strole
|
|
|
Conf - Trevor Phone #: ###-####-Conferance on sewer and interceptor.
|