Final | 4/14/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
Bill VanDegrift
|
|
|
Belinda Phone #: ###-#### final ok with the sink by the front door as a future fixture
|
Final | 3/8/2017 | 3/10/2017 | 3/10/2017 | A | CANC |
Dan Ediger
|
|
|
Belinda Phone #: ###-####
|
Plumbing Rough-in | 3/10/2017 | 3/10/2017 | 3/10/2017 | A | PASS |
Dan Ediger
|
|
|
Belinda Phone #: ###-####. A/W ok to cover completes r-in
|
Plumbing Rough-in | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | PASS |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PART |
Dan Ediger
|
|
|
under floor/groundwork for the laundry
|
Plumbing Rough-in | 2/10/2017 | 2/13/2017 | 2/13/2017 | P | PART |
Dan Ediger
|
|
|
As early as possible // Belinda Phone #: ###-####. ok to cover floor. Need to meet cross sectional area on venting.
|
Plumbing Rough-in | 2/9/2017 | 2/9/2017 | 2/9/2017 | P | PART |
Dan Ediger
|
|
|
Call ahead for access - Belinda Phone #: ###-####. Ground work on waste approved
|