Other | 10/6/2017 | 10/6/2017 | 10/6/2017 | P | CANC |
Eric Strole
|
|
|
as per Valley Plumbing-they did not do work after the rough in inspection-i told customer that they needed to pull a seperate permit for the work they did
|
PLM-Aging Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Madrigal
|
Groundwork | 1/26/2017 | 1/26/2017 | 1/26/2017 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Madrigal
|