Final | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | PASS |
Daryl Spivey
|
|
|
keys are under door mat at garage door. Phone #: ###-#### Inspection requested via web by john richmond
|
Plumbing Rough-in | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | PASS |
Eric Strole
|
|
|
keys under door mat at man door to garage, otherwise door will be open if after 8:30 a.m. Phone #: ###-#### Inspection requested via web by john richmond
|
Plumbing Rough-in | 2/15/2017 | 2/16/2017 | 2/16/2017 | A | PEND |
Eric Strole
|
|
|
door will be open Phone #: ###-#### Inspection requested via web by john richmond-Will pass r/i when building permit is issued.
|
Plumbing Rough-in | 2/2/2017 | 2/2/2017 | 2/2/2017 | P | PART |
Eric Strole
|
|
|
Eric will you let Candy (front desk) know if a building permit is needed? keys are in the crotch of bush next to garage. A piece of 1 1/2" abs pointing up to general area, under some leaves. Kitchen sink drain is only thing that needs to be inspected now in order to cover up. Bathroom will come later. Thxs Phone #: ###-#### Inspection requested via web by john richmond-Kitchen pass.
|