Final | 6/9/2017 | 6/9/2017 | 6/9/2017 | P | PASS |
Daryl Spivey
|
|
|
|
Sprinkler (Final) | 5/25/2017 | 5/26/2017 | 5/26/2017 | P | FAIL |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen. Upstairs water closets and the master shower valve are not caulked
|
Final | 5/12/2017 | 5/15/2017 | 5/15/2017 | A | NR |
Daryl Spivey
|
|
|
Inspection requested via web by Brian Johansen k/s and powder lav not ready.......ds
|
Plumbing Rough-in | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 2/2/2017 | 2/3/2017 | 2/3/2017 | P | NR |
Daryl Spivey
|
|
|
Inspection requested via web by Brian Johansen no test
|