Final | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Final | 8/1/2017 | 8/1/2017 | 8/1/2017 | P | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. Final pending locating the expansion tank on the gym building.
|
Final | 7/27/2017 | 7/27/2017 | 7/27/2017 | P | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. Add a cleanout cover at the drinking fountain. Install a tempering valve at each lavatory or one at the water heater set no higher than 120 degrees.
|
Plumbing Rough-in | 7/19/2017 | 7/19/2017 | 7/19/2017 | A | PASS |
Dan Ediger
|
|
|
ok to cover for drinking fountain rough
|
Final | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | NR |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|