Final | 6/26/2017 | 6/26/2017 | 6/26/2017 | A | PASS |
Dan Ediger
|
|
|
|
Final | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew Wilde. Provide an air-gap on the relief valve drain. Install a tempering valve on the public restroom lavatory sink.
|
Roof Drains | 2/23/2017 | 2/24/2017 | 2/24/2017 | P | PART |
Dan Ediger
|
|
|
Inspection will be ready by 10 am. Roof drains are located in the main office building. Phone #: ###-#### Inspection requested via web by Andrew Wilde. Install 18ga or greater nail plates on the plateline pennitrations. 5" nailplates are not adiquit. ok to pull test.
|