Final | 4/19/2017 | 4/20/2017 | 4/20/2017 | A | PASS |
Eric Strole
|
|
|
Homeowner will be home after 8:45 am Thank you. Phone #: ###-#### Inspection requested via web by Fred Anzaldua
|
Plumbing Rough-in | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Fred Anzaldua
|
Plumbing Rough-in | 3/22/2017 | 3/22/2017 | 3/22/2017 | P | FAIL |
Eric Strole
|
|
|
Fred Phone #: ###-####--Trap needs to be downstream of trap on shower and need to roll vent for toilet above invert.
|
Plumbing Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Fred Anzaldua-Need to plumb per the 2009 ISPC
|