Final | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Eric Strole
|
|
|
Requesting final close out inspection for Micron Building 51 Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | PASS |
Eric Strole
|
|
|
Installation of sewer lift station. East side of building 51. Been Scott primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
PLM-Aging Inspection | 5/22/2018 | 5/22/2018 | 5/22/2018 | | PART |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 2/20/2018 | 2/20/2018 | 2/20/2018 | | PART |
Eric Strole
|
|
|
wip
|
Water and/or Sewer | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | CANC |
Eric Strole
|
|
|
South East of building 51 and T-CUP facility. Installation of sewer manhole tie-in and 8in sewer line to the South. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | CANC |
Eric Strole
|
|
|
South East of building 51 and T-CUP facility. Installation of sewer manhole tie-in and 8in sewer line to the South. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | NR |
Eric Strole
|
|
|
South East of building 51 and T-CUP facility. Installation of sewer manhole tie-in and 8in sewer line to the South. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 11/17/2017 | 11/20/2017 | 11/20/2017 | A | NR |
Eric Strole
|
|
|
South East of building 51 and T-CUP facility. Installation of sewer manhole tie-in and 8in sewer line to the South. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | PART |
Eric Strole
|
|
|
East side of building 51. Connection of 3in sewer line to existing sewer line. Ben Scott onsite Phone #: ###-#### Inspection requested via web by Craig Fischer-Pressure sewer from tie-in to existing up to sump location ok to cover. Still need sump.
|
Storm Drains | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | PART |
Eric Strole
|
|
|
North East corner of building 51, connect 8in RDL''s to main storm drain line Phone #: ###-#### Inspection requested via web by Craig Fischer-All underground storm drain to roof drain complete.
|
Water and/or Sewer | 7/25/2017 | 7/26/2017 | 7/26/2017 | P | PART |
Eric Strole
|
|
|
West side of building 51. Pressure test on 8in potable water line. Phone #: ###-#### Inspection requested via web by Craig Fischer-8" water main and 4" water main into building test pass.
|
Water and/or Sewer | 7/20/2017 | 7/21/2017 | 7/21/2017 | P | PART |
Eric Strole
|
|
|
West side of building 51. Continue 8in potable water from North heading South to tie in. Phone #: ###-#### Inspection requested via web by Craig Fischer-Section of 8" water main installed ok to cover, still needs tested.
|
Water and/or Sewer | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | NR |
Eric Strole
|
|
|
West side of building 51. Continue 8in potable water from North heading South to tie in. Phone #: ###-#### Inspection requested via web by Craig Fischer-Chip chip chip no gain
|
Water and/or Sewer | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | CANC |
Eric Strole
|
|
|
West side of building 51. Continue 8in potable water from North heading South to tie in. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | PART |
Eric Strole
|
|
|
West side of building 51. Continue 8in potable water from North heading South to tie in. Phone #: ###-#### Inspection requested via web by Craig Fischer-Section of 8" water main installed ok to cover, still needs tested.
|
Water and/or Sewer | 7/7/2017 | 7/10/2017 | 7/10/2017 | P | PART |
Eric Strole
|
|
|
8" water main up to south end of building 36.
|
Water and/or Sewer | 7/7/2017 | 7/7/2017 | 7/7/2017 | P | PART |
Eric Strole
|
|
|
West side of Building 51. Continuation of 8in potable water from North to South connection Phone #: ###-#### Inspection requested via web by Craig Fischer-Section of water main installed ok to cover, still needs tested.
|
Water and/or Sewer | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PART |
Eric Strole
|
|
|
West side of Building 51. Continuation of 8in potable water from North to South connection Phone #: ###-#### Inspection requested via web by Craig Fischer-Section of water main installed ok to cover, still needs tested.
|
Water and/or Sewer | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | PART |
Eric Strole
|
|
|
North-West corner building 51. Connection of 12in Storm Drain line from building 50 into existing manhole, tie-in 8in storm drain line from building 51 into 12in line. Phone #: ###-#### Inspection requested via web by Craig Fischer-Section complete ok to cover.
|
Water and/or Sewer | 6/28/2017 | 6/29/2017 | 6/30/2017 | P | PART |
Eric Strole
|
|
|
North-West corner building 51. Connection of 12in Storm Drain line from building 50 into existing manhole, tie-in 8in storm drain line from building 51 into 12in line. Phone #: ###-#### Inspection requested via web by Craig Fischer-Section complete ok to cover, still needs tested.
|
Water and/or Sewer | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | PART |
Eric Strole
|
|
|
North-West corner building 51. Connection of 12in Storm Drain line from building 50 into existing manhole, tie-in 8in storm drain line from building 51 into 12in line. Phone #: ###-#### Inspection requested via web by Craig Fischer-Digging
|
Water and/or Sewer | 6/28/2017 | 6/29/2017 | 6/29/2017 | P | CANC |
Eric Strole
|
|
|
Continuation of 12in storm drain line heading North. Installing stubs for 4in roof leader connections to 12in main line. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | CANC |
Eric Strole
|
|
|
South-East corner of building 51. Continuation of 12in storm drain line heading North. Installing stubs for 4in roof leader connections to 12in main line. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 6/27/2017 | 6/28/2017 | 6/28/2017 | P | PART |
Eric Strole
|
|
|
South-East corner of building 51. Continuation of 12in storm drain line heading North. Installing stubs for 4in roof leader connections to 12in main line. Phone #: ###-#### Inspection requested via web by Craig Fischer-Section complete ok to cover, still needs tested.
|
Water and/or Sewer | 6/27/2017 | 6/28/2017 | 6/28/2017 | P | CANC |
Eric Strole
|
|
|
North-West corner building 51. Connection of 12in Storm Drain line from building 50 into existing manhole, tie-in 8in storm drain line from building 51 into 12in line. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 6/26/2017 | 6/27/2017 | 6/27/2017 | P | NR |
Eric Strole
|
|
|
South-East corner of building 51. Continuation of 12in storm drain line heading North. Installing stubs for 4in roof leader connections to 12in main line. Phone #: ###-#### Inspection requested via web by Craig Fischer-No progress
|
Water and/or Sewer | 6/26/2017 | 6/27/2017 | 6/27/2017 | P | NR |
Eric Strole
|
|
|
West side of building 51. Continuation of 8in potable water heading South. Phone #: ###-#### Inspection requested via web by Craig Fischer-No progress
|
Water and/or Sewer | 6/26/2017 | 6/27/2017 | 6/27/2017 | P | NR |
Eric Strole
|
|
|
North-West corner building 51. Connection of 12in Storm Drain line from building 50 into existing manhole, tie-in 8in storm drain line from building 51 into 12in line. Phone #: ###-#### Inspection requested via web by Craig Fischer-No progress
|
Water and/or Sewer | 6/26/2017 | 6/27/2017 | 6/27/2017 | A | PART |
Eric Strole
|
|
|
South-East corner of building 51. Continuation of 12in storm drain line heading North. Installing stubs for 4in roof leader connections to 12in main line. Phone #: ###-#### Inspection requested via web by Craig Fischerr-Section complete ok to cover, still needs tested.
|
Storm Drains | 6/23/2017 | 6/26/2017 | 6/26/2017 | P | PART |
Eric Strole
|
|
|
South-East corner of building 51. Continuation of 12in storm drain line heading North. Installing stubs for 4in roof leader connections to 12in main line. Phone #: ###-#### Inspection requested via web by Craig Fischer-Section complete ok to cover, still needs tested.
|
Water and/or Sewer | 6/23/2017 | 6/26/2017 | 6/26/2017 | A | NR |
Eric Strole
|
|
|
West side of building 51. Continuation of 8in potable water heading South. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Storm Drains | 6/23/2017 | 6/26/2017 | 6/26/2017 | A | NR |
Eric Strole
|
|
|
North-West corner building 51. Connection of 12in Storm Drain line from building 50 into existing manhole, tie-in 8in storm drain line from building 51 into 12in line. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 6/21/2017 | 6/22/2017 | 6/22/2017 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 6/21/2017 | 6/22/2017 | 6/22/2017 | A | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 6/21/2017 | 6/21/2017 | 6/21/2017 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PART |
Eric Strole
|
|
|
4" sewer tie-in and test west side pass.
|
Water and/or Sewer | 6/19/2017 | 6/20/2017 | 6/20/2017 | P | PART |
Eric Strole
|
|
|
20' installed.
|
Water and/or Sewer | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | NR |
Eric Strole
|
|
|
|
Water and/or Sewer | 6/19/2017 | 6/19/2017 | 6/19/2017 | P | DONE |
Eric Strole
|
|
|
West side of building 51. Continue 4in sewer to tie in with existing sewer line Phone #: ###-#### Inspection requested via web by Craig Fischer-Conferance on sewer
|
Water and/or Sewer | 6/16/2017 | 6/16/2017 | 6/16/2017 | A | PART |
Eric Strole
|
|
|
South East corner of building 51, connection of 8in potable water to building Phone #: ###-#### Inspection requested via web by Craig Fischer-Water supply south/east corner test pass.
|
Water and/or Sewer | 6/12/2017 | 6/13/2017 | 6/13/2017 | P | PART |
Bill VanDegrift
|
|
|
water up to the building, need plumber to tie in next.
|
Water and/or Sewer | 6/9/2017 | 6/12/2017 | 6/12/2017 | P | PART |
Bill VanDegrift
|
|
|
South East corner of building 51. Continuation of 8" water main. Phone #: ###-#### Inspection requested via web by Craig Fischer working on the water servces south east corner
|
Water and/or Sewer | 6/9/2017 | 6/9/2017 | 6/9/2017 | P | NR |
Eric Strole
|
|
|
South East corner of building 51. Continuation of 8" water main. Phone #: ###-#### Inspection requested via web by Craig Fischer-No gain
|
Water and/or Sewer | 6/8/2017 | 6/9/2017 | 6/9/2017 | A | PART |
Eric Strole
|
|
|
South East corner of building 51. Connecting 8in RDL to 12in Storm Drain running North out of manhole. Phone #: ###-#### Inspection requested via web by Craig Fischer-Section of storm drain installed ok to cover, Still needs tested.
|
Water and/or Sewer | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | NR |
Eric Strole
|
|
|
South East corner of building 51. Connecting 8in RDL to 12in Storm Drain running North out of manhole. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Storm Drains | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | DONE |
Eric Strole
|
|
|
South East corner of building 51. Connecting 8in RDL to 12in Storm Drain running North out of manhole. Phone #: ###-#### Inspection requested via web by Craig Fischer-Conferance on stormdrain and water main.
|
Storm Drains | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | NR |
Eric Strole
|
|
|
South East corner of building 51. Connecting 8in RDL to 12in Storm Drain running North out of manhole. Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 5/11/2017 | 5/12/2017 | 5/12/2017 | P | PART |
Eric Strole
|
|
|
Stormdrain south/east side installed.
|
Water and/or Sewer | 5/11/2017 | 5/12/2017 | 5/12/2017 | A | NR |
Eric Strole
|
|
|
|
Water and/or Sewer | 5/10/2017 | 5/11/2017 | 5/11/2017 | A | PART |
Eric Strole
|
|
|
220' of 8" water main installed so far. All needs tested.
|
Water and/or Sewer | 5/9/2017 | 5/10/2017 | 5/10/2017 | P | PART |
Eric Strole
|
|
|
180' of 8" water main installed
|
Water and/or Sewer | 5/9/2017 | 5/10/2017 | 5/10/2017 | A | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | CANC |
Eric Strole
|
|
|
No progress
|
Water and/or Sewer | 5/8/2017 | 5/9/2017 | 5/9/2017 | A | PART |
Eric Strole
|
|
|
Installing Potable Water between South East corner of building 51 and previously installed 8in potable water by N2 Plant Phone #: ###-#### Inspection requested via web by Craig Fischer-140' of 8" water main installed from N2 building side to building 51 installed so far. Will install saddle on same line for 2" PE service for teacup building. All piping still needs tested.
|
Water and/or Sewer | 5/5/2017 | 5/5/2017 | 5/5/2017 | P | CANC |
Eric Strole
|
|
|
No gain
|
Water and/or Sewer | 5/3/2017 | 5/4/2017 | 5/4/2017 | P | PART |
Eric Strole
|
|
|
126' of 8" water main installed.
|
Water and/or Sewer | 5/3/2017 | 5/4/2017 | 5/4/2017 | A | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 5/2/2017 | 5/3/2017 | 5/3/2017 | P | PART |
Eric Strole
|
|
|
4in potable water line, North West area of building 51 Phone #: ###-#### Inspection requested via web by Craig Fischer-106' installed with blue tracer wire.
|
Water and/or Sewer | 5/2/2017 | 5/3/2017 | 5/3/2017 | A | PART |
Eric Strole
|
|
|
4in potable water line, North West area of building 51 Phone #: ###-#### Inspection requested via web by Craig Fischer-80' of 8" installed. Need a blue18 gauge tracer wire.
|
Water and/or Sewer | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | PART |
Eric Strole
|
|
|
4in potable water line, North West area of building 51 Phone #: ###-#### Inspection requested via web by Craig Fischer-26' of 8" water main installed.
|
Water and/or Sewer | 5/1/2017 | 5/2/2017 | 5/2/2017 | A | CANC |
Eric Strole
|
|
|
4in potable water line, North West area of building 51 Phone #: ###-#### Inspection requested via web by Craig Fischer-No gain
|
Water and/or Sewer | 4/28/2017 | 5/1/2017 | 5/1/2017 | A | PART |
Eric Strole
|
|
|
4in potable water line, North West area of building 51 Phone #: ###-#### Inspection requested via web by Craig Fischer-4" water main from building out to valve box installed. Need to install 8" water main from valve box to 8' existing main and test all 4" & 8" when complete.
|
Water and/or Sewer | 4/27/2017 | 4/28/2017 | 4/28/2017 | P | PART |
Eric Strole
|
|
|
4in potable water line, North West area of building 51 Phone #: ###-#### Inspection requested via web by Craig Fischer-1st 40' of 4" water supply from building out north west side installed. Still need test.
|
Water and/or Sewer | 4/26/2017 | 4/27/2017 | 4/27/2017 | A | NR |
Eric Strole
|
|
|
4in potable water line, North West area of building 51 Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 4/18/2017 | 4/19/2017 | 4/19/2017 | P | CANC |
Eric Strole
|
|
|
North West corner of building 51. 8in roof drain line from building 51, connecting to 12in roof drain line from building 50 and continuing to existing storm drain manhole Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Storm Drains | 4/17/2017 | 4/18/2017 | 4/18/2017 | P | CANC |
Eric Strole
|
|
|
North West corner of building 51. 8in roof drain line from building 51, connecting to 12in roof drain line from building 50 and continuing to existing storm drain manhole Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | PART |
Eric Strole
|
|
|
Potable Water at bore pit, South West corner of Micron Bld 51 project Phone #: ###-#### Inspection requested via web by Craig Fischer-168' installed so far. Still need tested.
|
Water and/or Sewer | 3/23/2017 | 3/24/2017 | 3/24/2017 | P | CANC |
Eric Strole
|
|
|
Potable Water at bore pit, South West corner of Micron Bld 51 project Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 3/23/2017 | 3/24/2017 | 3/23/2017 | P | CANC |
Eric Strole
|
|
|
Potable Water at bore pit, South West corner of Micron Bld 51 project Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 3/23/2017 | 3/23/2017 | 3/23/2017 | A | CANC |
Eric Strole
|
|
|
Potable Water at bore pit, South West corner of Micron Bld 51 project Phone #: ###-#### Inspection requested via web by Craig Fischer
|
Water and/or Sewer | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PART |
Eric Strole
|
|
|
Potable Water at bore pit, South West corner of Micron Bld 51 project Phone #: ###-#### Inspection requested via web by Craig Fischer-148' of 8' water service installed so far.
|
Water and/or Sewer | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | PART |
Eric Strole
|
|
|
8" Potable Water at bore pit, South West corner of Micron Bld 51 project Phone #: ###-#### Inspection requested via web by Craig Fischer-88' of 8' water service installed so far.
|
Storm Drains | 3/13/2017 | 3/13/2017 | 3/13/2017 | P | CANC |
Eric Strole
|
|
|
This section of storm drains is for gutters. Requires no inspection from plumbing.
|
Water and/or Sewer | 3/8/2017 | 3/9/2017 | 3/9/2017 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 3/8/2017 | 3/9/2017 | 3/9/2017 | A | NR |
Eric Strole
|
|
|
Still chipping rock
|
Water and/or Sewer | 3/7/2017 | 3/8/2017 | 3/8/2017 | P | PART |
Eric Strole
|
|
|
1st 40' of storm drain from building out installed so far.
|
Water and/or Sewer | 3/8/2017 | 3/9/2017 | 3/8/2017 | A | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 3/7/2017 | 3/8/2017 | 3/8/2017 | A | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PART |
Eric Strole
|
|
|
Up to 80' installed. Still need tested.
|
Water and/or Sewer | 3/7/2017 | 3/7/2017 | 3/7/2017 | A | PART |
Eric Strole
|
|
|
40' of 4" sewer out of building 51 installed so far. Still need tested.
|