Final | 8/2/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | PASS |
Eric Strole
|
|
|
Inspection requested via web by Brian Johansen
|
Groundwork | 3/7/2017 | 3/8/2017 | 3/8/2017 | P | PASS |
Dan Ediger
|
|
|
groundwork Phone #: ###-#### Inspection requested via web by Brian Johansen. Notified the excavator that the water line must be protected going through the concrete wall. Builder is supposed to supply a sleeve.
|